Incorporating Elevators into the Drawings

2m 11s

Jim Viviano of 5G Studio takes us through all phases of Gateway Center II.  He’ll talk about the structural system and materials used, as well as MEP and budgeting considerations. Additionally he will show an example of a RFI, and discuss submittals and revisions.

Transcript summarylog in to access this content in full.

So this is the first floor of the parking and, but it also is the first floor where the main entrance is so what you're seeing here is the main lobby, building service, office, main electric room, trash room, mail room, a service vestibule and then two elevators and the two elevators up here are, one is a passenger and then this one here is like passenger/service elevator so it actually has two doors, front and back which the back door opens up off the service vestibule and then the front door opens up to the main tenant lobby. And the interesting thing about this is that we didn't want to have to put in a third elevator because it would've really, the building would've been over elevated. So we ended up just doing the double elevator, the one that could service both.

Log in to access files

From the course:
5G STUDIO - GATEWAY CENTER II

Duration: 49m