You have reached one of our paid Practical Application video tutorials for the course:

STUDIO 111 - Technology Company Headquarters

You can either log in to view it or learn more about our memberships.

Variable Refrigerant System

2m 49s

Scott Parker of Studio 111 takes us through the schematic design and design development phases of a technology company headquarters.  He’ll talk about the challenges they faced with the structural system as well as the local area. Additionally he will talk through the mechanical, electrical, and plumbing systems used.

Transcript summarylog in to access this content in full.

So rather than having say with a variable volume of air, we were trying to run a 36 inch duct in a space where we had 18 inches. It simply didn't work physically. What we are running now is a 3/4 inch refrigerant line, and a 6 inch fresh air line.

Log in to access files

From the course:
STUDIO 111 - Technology Company Headquarters

Duration: 38m