Scott Parker of Studio 111 takes us through the schematic design and design development phases of a technology company headquarters.  He’ll talk about the challenges they faced with the structural system as well as the local area. Additionally he will talk through the mechanical, electrical, and plumbing systems used.

Transcript summarylog in to access this content in full.

Which we know we can't do and they were kind of, it was a joking way of them telling us like we need more room. So what we did was, we actually invented a basement. So the basement came out of working with the electrical engineer.