You have reached one of our paid Practical Application video tutorials for the course:

EV&A ARCHITECTS - TWO SUMMERLIN OFFICE BUILDING

You can either log in to view it or learn more about our memberships.

MEP Coordination

52s

Matt Burns of Ed Vance and Associates explains the design development phase of the Two Summerlin Office Building in Las Vegas, Nevada.  He explains how the neighborhood impacted the building design, as well as the structural system and materials used. He also takes us inside the building and explains the interior finish package.

Transcript summarylog in to access this content in full.

So the coordination between the different elements that are located in a ceiling like the low lighting fixtures, the mechanical systems, the decorative ceiling, the roll down shutters in front of the elevator doors, etc, etc, was very difficult and very very tight in the ceiling. So it was almost a daily coordination with the contractor as we were building this to make sure that everything fit exactly where we needed it to fit.

Log in to access files

From the course:
EV&A ARCHITECTS - TWO SUMMERLIN OFFICE BUILDING

Duration: 22m